view in publisher's site

Design, Construction, and Monitoring of a 14.9 m High Geosynthetic Reinforced Segmental Retaining Wall in a Seismically Active Region

Development of a new master planned community in a seismically active area required a 14.9 m high retaining wall to be constructed. The segmental retaining wall option was chosen based on economics, while the installation contractor and materials incorporated in the wall were chosen for their past performance and familiarity to the local regulatory agency. The design was developed using National Concrete Masonry (NCMA) methods. Construction procedures and details of monitoring are discussed. Post construction movements are provided for vertical and horizontal wall deformations. In addition, movements resulting from the October 1999 Hector Mine earthquake are documented. Monitoring of the wall will continue in anticipation of capturing the effect of additional seismic events.

طراحی، ساخت و نظارت بر دیوار بلند مدت ۹ / ۹ متر در یک دیوار فعال در منطقه فعال

توسعه یک جامعه جدید برنامه‌ریزی‌شده در یک منطقه فعال زمین‌لرزه خیز، نیاز به یک دیوار نگه داری ۱۴ / ۹ متر دارد که باید ساخته شود. انتخاب دیوار حایل قطعه‌ای براساس اقتصاد انتخاب شد، در حالی که پیمان‌کار نصب و مواد مورد استفاده در این دیوار برای عملکرد گذشته خود و آشنایی با آژانس تنظیم‌کننده محلی انتخاب شدند. این طراحی با استفاده از روش‌های National Concrete (NCMA)ساخته شد. مراحل ساخت و جزییات نظارت مورد بحث قرار گرفته‌اند. حرکات پس از ساختمان برای تغییر شکل عمودی و افقی نشان‌داده شده‌است. علاوه بر آن، جنبش‌های ناشی از زلزله اکتبر ۱۹۹۹ (هکتور)مستند شده‌اند. نظارت بر دیوار به پیش‌بینی تاثیر رویداده‌ای اضافی لرزه‌ای ادامه خواهد داد.
ترجمه شده با

سفارش ترجمه مقاله و کتاب - شروع کنید

95/12/18 - با استفاده از افزونه دانلود فایرفاکس و کروم٬ چکیده مقالات به صورت خودکار تشخیص داده شده و دکمه دانلود فری‌پیپر در صفحه چکیده نمایش داده می شود.